Battery part

This time we are looking on the crossword clue for: Battery part.
it’s A 12 letters crossword puzzle definition. See the possibilities below.

Did you find what you needed?
We hope you did!. If you are still unsure with some definitions, don’t hesitate to search them here with our crossword solver.

Possible Answers: TEST, ANODE, CELL, GRID, ELECTRODE, CATCHER, ACIDCELL.

Last seen on: –Eugene Sheffer – King Feature Syndicate Crossword – Jan 17 2022
NY Times Crossword 11 Apr 21, Sunday
Thomas Joseph – King Feature Syndicate Crossword – Dec 18 2020
LA Times Crossword 6 Dec 20, Sunday
Wall Street Journal Crossword – August 02 2020 – Slurred Speech
Wall Street Journal Crossword – September 24 2019 – If the Shoe Fits
Eugene Sheffer – King Feature Syndicate Crossword – Aug 5 2019
Thomas Joseph – King Feature Syndicate Crossword – Mar 22 2019
Eugene Sheffer – King Feature Syndicate Crossword – Jan 30 2019
Thomas Joseph – King Feature Syndicate Crossword – Jan 3 2019
Universal Crossword – July 21 2018 Saturday
Universal Crossword – June 29 2018

Random information on the term “TEST”:

A test or examination (informally, exam or evaluation) is an assessment intended to measure a test-taker’s knowledge, skill, aptitude, physical fitness, or classification in many other topics (e.g., beliefs). A test may be administered verbally, on paper, on a computer, or in a confined area that requires a test taker to physically perform a set of skills. Tests vary in style, rigor and requirements. For example, in a closed book test, a test taker is often required to rely upon memory to respond to specific items whereas in an open book test, a test taker may use one or more supplementary tools such as a reference book or calculator when responding to an item. A test may be administered formally or informally. An example of an informal test would be a reading test administered by a parent to a child. An example of a formal test would be a final examination administered by a teacher in a classroom or an I.Q. test administered by a psychologist in a clinic. Formal testing often results in a grade or a test score. A test score may be interpreted with regards to a norm or criterion, or occasionally both. The norm may be established independently, or by statistical analysis of a large number of participants. An exam is meant to test a child’s knowledge or willingness to give time to manipulate that subject.

TEST on Wikipedia

Random information on the term “CELL”:

The PowerPC e200 is a family of 32-bit Power Architecture microprocessor cores developed by Freescale for primary use in automotive and industrial control systems. The cores are designed to form the CPU part in system-on-a-chip (SoC) designs with speed ranging up to 600 MHz, thus making them ideal for embedded applications.

The e200 core is developed from the MPC5xx family processors, which in turn is derived from the MPC8xx core in the PowerQUICC SoC processors. e200 adheres to the Power ISA v.2.03 as well as the previous Book E specification. All e200 core based microprocessors are named in the MPC55xx and MPC56xx/JPC56x scheme, not to be confused with the MPC52xx processors which is based on the PowerPC e300 core.

In April 2007 Freescale and IPextreme opened up the e200 cores for licensing to other manufacturers.

Continental AG and Freescale are developing SPACE, a tri-core e200 based processor designed for electronic brake systems in cars.

STMicroelectronics and Freescale have jointly developed microcontrollers for automotive applications based on e200 in the MPC56xx/SPC56x family.

CELL on Wikipedia

Random information on the term “GRID”:

An electrical grid is an interconnected network for delivering electricity from producers to consumers. It consists of generating stations that produce electrical power, high voltage transmission lines that carry power from distant sources to demand centers, and distribution lines that connect individual customers.

Power stations may be located near a fuel source, at a dam site, or to take advantage of renewable energy sources, and are often located away from heavily populated areas. They are usually quite large to take advantage of the economies of scale. The electric power which is generated is stepped up to a higher voltage at which it connects to the electric power transmission network.

The bulk power transmission network will move the power long distances, sometimes across international boundaries, until it reaches its wholesale customer (usually the company that owns the local electric power distribution network).

On arrival at a substation, the power will be stepped down from a transmission level voltage to a distribution level voltage. As it exits the substation, it enters the distribution wiring. Finally, upon arrival at the service location, the power is stepped down again from the distribution voltage to the required service voltage(s).

GRID on Wikipedia